September 26, 2025: Tile Work and Pew Installation

Many of the pews are installed.

Wooden squares have been installed in the seven spaces leading forward until the decorative tiles can be installed.

The circle in the entryway to the nave also has a wooden circle as a placeholder until the decorative image is installed..

The white tiles are being installed in the circle surrounding the future baptismal font.

White tiles are being laid in the chancel.