Massive lift that the painters are using to reach all the way up to the clerestory and ceiling to prep for painting.
One of two scissor lifts that the painters are using to patch and prepare the the drywall for painting. We have over 100 spots for them to address.
The old speakers on the tall columns have been removed and the holes have been patched over.
In the courtyard between the Sanctuary and the Harris Wing, the tree and bushes have been cut down as part of the water mitigation solution. Next will be regrading, pouring stamped concrete, and adding a gutter(s) to get the water to drain properly.