The pews and speakers are covered.
Getting the glue up from the old tile was a big task and took several tools.
Glue successfully removed.
Using a wet saw to cut through the concrete.
The font is going down. Sledge hammer, a variety of saws, and good ole man power are put to work.
More font work.
And the font came tumblin’ down.
More wet-sawing.
They’re cutting a trench in the concrete to run the electricals.
Remember, you can always peek in safely from the outside windows.
